Pilot tests on methods to form working platform on soft clay
Pilot tests on the usage of vacuum preloading combined with short prefabricated vertical drains (PVDs) to form a working platform for future soil improvement work were conducted at a land reclamation site in Tianjin, China. The short PVDs were connected using three methods – the conventional vacuum...
Saved in:
Main Authors: | Sun, Liqiang, Meng, Lingxiao, Guo, Wei, Feng, Xiaowei, Nie, Wen, Chu, Jian, Hou, Jinfang |
---|---|
Other Authors: | School of Civil and Environmental Engineering |
Format: | Article |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/89190 http://hdl.handle.net/10220/46127 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Land reclamation using the horizontal drainage enhanced geotextile sheet method
by: Chen, Hao, et al.
Published: (2023) -
Experimental study of the behavior of a lumpy fill of soft clay
by: Robinson, R.G., et al.
Published: (2014) -
Experimental study of the behavior of a lumpy fill of soft clay
by: Robinson, RG, et al.
Published: (2021) -
The feasibility study of a reclamation project of the foreshore land and real estate development around Laguna lake
by: Ilustre, Francisco L.
Published: (1970) -
Floating hydrocarbon storage facility
by: Awn, POP, et al.
Published: (2021)