Economic acceptance sampling plans for capable jobshop production processes.
The objective of this paper is to develop appropriate acceptance sampling plans in the context of modern job shop production processes. The motivation is to provide economic rationale for the construction of acceptance sampling plans.
Saved in:
Main Authors: | Chua, Celeste Chee Ming., Ho, Jean Wei Ying., Ong, Shirley Shilin. |
---|---|
Other Authors: | Walker, John |
Format: | Final Year Project |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/9082 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
SkSP-V Acceptance Sampling Plan based on Process Capability Index
by: Muhammad Aslam", et al.
Published: (2019) -
Zero acceptance number sampling plan.
by: Ong, Sze Wei., et al.
Published: (2008) -
Simulasi Proses Produksi dengan Sistem Jobshop pada UKM XYZ
by: Akmal, Fayola, et al.
Published: (2021) -
Sustainable capability planning for hospital operating theatre
by: LI ANG
Published: (2010) -
Drivers of productivity, efficiency and market capability of EJB Farms, Inc.
by: Lim, Janelle Yvonne, et al.
Published: (2012)