An application of master schedule smoothing and planned lead time control
Make-to-order (MTO) manufacturers must ensure concurrent availability of all parts required for production, as any unavailability may cause a delay in completion time. A major challenge for MTO manufacturers operating under high demand variability is to produce customized parts in time to meet inter...
Saved in:
Main Authors: | Graves, Stephen C., Teo, Chee-Chong, Bhatnagar, Rohit |
---|---|
Other Authors: | Nanyang Business School |
Format: | Article |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/98150 http://hdl.handle.net/10220/12323 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Setting planned lead times for a make-to-order production system with master schedule smoothing
by: Teo, Chee-Chong, et al.
Published: (2019) -
Optimizing a recover-and-assemble remanufacturing system with production smoothing
by: Zahraei, Seyed Mehdi, et al.
Published: (2019) -
Optimizing a supply network with production smoothing, freight expediting and safety stocks : an analysis of tactical trade-offs
by: Zahraei, Seyed Mehdi, et al.
Published: (2019) -
AUTOMATIC SUBASSEMBLY SEQUENCING FOR OFFSHORE RIGS
by: ABBOTT ERNEST LESLIE SIDNEY
Published: (2015) -
Discovery of a new genus and new species of Indo-West Pacific pilumnoidid crab from a semisubmersible oil platform (Crustacea: Brachyura: Pseudozioidea)
by: Ng, P.K.L., et al.
Published: (2014)