Apply heuristics and meta-heuristics to large-scale process batch scheduling
Scheduling Problems and Solutions
Saved in:
Main Authors: | He, Y., Hui, C.-W. |
---|---|
Other Authors: | SOLAR ENERGY RESEARCH INST OF S'PORE |
Format: | Others |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/114750 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Evolutionary and meta-heuristic scheduling
by: Tan, K.C., et al.
Published: (2014) -
New Meta-heuristics for the Resource-constrained Project Scheduling Problem
by: LIM, Andrew, et al.
Published: (2013) -
Meta-heuristics for scheduling flexible job shop problems with constraints
by: Gao, Kaizhou
Published: (2015) -
New meta-heuristics for the resource-constrained project scheduling problem
by: Lim, A., et al.
Published: (2013) -
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
by: DEBELS, Dieter, et al.
Published: (2006)