Schedule Delay Risk in Subsurface Explorations
Schedule Delay Risk in Subsurface Explorations
Saved in:
Main Authors: | Cui Q., Baecher G., Lu Y. |
---|---|
Other Authors: | BUILDING |
Format: | Working Paper/Technical Report |
Published: |
2018
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/140734 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Model for Schedule Risk Evaluation of Subsurface Explorations
by: Lu Y., et al.
Published: (2018) -
Model for schedule risk evaluation in subsurface explorations
by: Lu Y., et al.
Published: (2018) -
Appointment scheduling with delay tolerance heterogeneity
by: WANG, Shuming, et al.
Published: (2024) -
LASEM AND PATI SUBSURFACE FAULT MODEL AT CENTRAL JAVA, INDONESIA, CONSTRUCTED BY MEANS OF MAGNETIC AND GRAVITY EXPLORATION METHODS
by: Kirbani, Sri Brotopuspito, et al.
Published: (2006) -
Scheduling of pavement maintenance to minimize traffic delays
by: Fwa, T.F., et al.
Published: (2014)