BOT ARRANGEMENTS FOR INFRASTRUCTURE PROJECTS IN PAKISTAN
Master's
Saved in:
Main Author: | TAUHA HUSSAIN ALI |
---|---|
Other Authors: | BUILDING |
Format: | Theses and Dissertations |
Published: |
2019
|
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/150755 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
NEGOTIATION-BASED RISK MANAGEMENT FOR PPP-BOT INFRASTRUCTURE PROJECTS
by: MEGHDAD ATTARZADEH
Published: (2015) -
Options-based negotiation management of PPP?BOT infrastructure projects
by: Meghdad Attarzadeh, et al.
Published: (2018) -
Private sector participation in infrastructure projects: A methodology to analyse viability of BOT
by: Ranasinghe, M.
Published: (2013) -
COMPARATIVE STUDY OF BOT TOLL ROAD ARRANGEMENTS BETWEEN INDONESIA AND MALAYSIA
by: KURNIAWAN KASUDARMAN
Published: (2019) -
Life-cycle financial modelling of long term infrastructure projects "PPP-BOT projects" under uncertainty and risk
by: Attarzadeh, M., et al.
Published: (2014)