VARIATIONS UNDER THE MAJOR FORMS OF BUILDING CONTRACT IN SINGAPORE
Bachelor's
Saved in:
Main Author: | CHUA PENG CHONG |
---|---|
Other Authors: | SCHOOL OF BUILDING & ESTATE MANAGEMENT |
Format: | Theses and Dissertations |
Published: |
2019
|
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/154485 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
BUILDING CONTRACT CLAIMS IN SINGAPORE
by: STEPHEN WILLIAM DONOHOE
Published: (2020) -
DIRECT LOSS AND/OR EXPENSE CLAIMS UNDER THE SIA 87 FORM OF CONTRACT
by: MICHAEL NG KEAN TEIK
Published: (2019) -
Application of design and build contracts in Singapore
by: Chia, Wai Mun., et al.
Published: (2009) -
CONDITIONS OF CONTRACT FOR DESIGN AND BUILD CONTRACT
by: NORHAZAN ABDUL RAHMAN
Published: (2019) -
Control of price related terms in standard form contracts in Singapore
by: LOO, Wee Ling
Published: (2019)