An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing
10.1080/00207543.2017.1363428
Saved in:
Main Authors: | Liu, Changchun, Xiang, Xi, Zheng, Li, Ma, Jing |
---|---|
Other Authors: | INST OF OPERATIONS RESEARCH & ANALYTICS |
Format: | Article |
Language: | English |
Published: |
TAYLOR & FRANCIS LTD
2019
|
Subjects: | |
Online Access: | https://scholarbank.nus.edu.sg/handle/10635/155198 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Language: | English |
Similar Items
-
New meta-heuristics for the resource-constrained project scheduling problem
by: Lim, A., et al.
Published: (2013) -
New Meta-heuristics for the Resource-constrained Project Scheduling Problem
by: LIM, Andrew, et al.
Published: (2013) -
A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem
by: Liu, Changchun, et al.
Published: (2019) -
Resource-constrained scheduling for maritime traffic management
by: AGUSSURJA, Lucas, et al.
Published: (2018) -
A Hybrid Framework for Over-Constrained Generalized Resource-Constrained Project Scheduling Problems
by: LIM, Andrew, et al.
Published: (2010)