Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore
10.1080/01446190500040638
Saved in:
Main Authors: | Low, S.P., Wu, M. |
---|---|
Other Authors: | BUILDING |
Format: | Article |
Published: |
2013
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/45749 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Modelling just-in-time purchasing in the ready mixed concrete industry
by: WU MIN
Published: (2010) -
Modeling just-in-time purchasing in the ready mixed concrete industry
by: Min, W., et al.
Published: (2013) -
EOQ, JIT and fixed costs in the ready-mixed concrete industry
by: Min, W., et al.
Published: (2013) -
An adopted neural network model for estimating productivity performance of ready-mixed concrete (RMC) placement for Metro Manila buildings
by: Alonzo, Joel U.
Published: (1999) -
Comparison of the concreting productivities in Hong Kong and Beijing and a proposed comparison methodology
by: Wang, S.Q., et al.
Published: (2013)