An integrated approach to generate construction schedules
Computing Systems in Engineering
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2013
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/46387 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-46387 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-463872024-11-14T14:24:01Z An integrated approach to generate construction schedules Lee, T.-J. Soh, C.-K. SCHOOL OF BUILDING & REAL ESTATE Computing Systems in Engineering 4 2-3 307-315 2013-10-16T02:00:29Z 2013-10-16T02:00:29Z 1993 Article Lee, T.-J.,Soh, C.-K. (1993). An integrated approach to generate construction schedules. Computing Systems in Engineering 4 (2-3) : 307-315. ScholarBank@NUS Repository. 09560521 http://scholarbank.nus.edu.sg/handle/10635/46387 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
description |
Computing Systems in Engineering |
author2 |
SCHOOL OF BUILDING & REAL ESTATE |
author_facet |
SCHOOL OF BUILDING & REAL ESTATE Lee, T.-J. Soh, C.-K. |
format |
Article |
author |
Lee, T.-J. Soh, C.-K. |
spellingShingle |
Lee, T.-J. Soh, C.-K. An integrated approach to generate construction schedules |
author_sort |
Lee, T.-J. |
title |
An integrated approach to generate construction schedules |
title_short |
An integrated approach to generate construction schedules |
title_full |
An integrated approach to generate construction schedules |
title_fullStr |
An integrated approach to generate construction schedules |
title_full_unstemmed |
An integrated approach to generate construction schedules |
title_sort |
integrated approach to generate construction schedules |
publishDate |
2013 |
url |
http://scholarbank.nus.edu.sg/handle/10635/46387 |
_version_ |
1821199761771855872 |