An integrated approach to generate construction schedules
Computing Systems in Engineering
Saved in:
Main Authors: | Lee, T.-J., Soh, C.-K. |
---|---|
Other Authors: | SCHOOL OF BUILDING & REAL ESTATE |
Format: | Article |
Published: |
2013
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/46387 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Integrated security constrained generation scheduling in an interconnected system using an IA approach
by: Srinivasan, Dipti, et al.
Published: (2014) -
Integrated security constrained generation scheduling in an interconnected system using an IA approach
by: Srinivasan, Dipti, et al.
Published: (2014) -
Integrated framework for devising optimum generation schedules
by: Srinivasan, Dipti, et al.
Published: (2014) -
Integrated framework for devising optimum generation schedules
by: Srinivasan, Dipti, et al.
Published: (2014) -
AUTOMATED SCHEDULE GENERATION AND ANALYSIS FROM A CONSTRUCTION REQUIREMENT PERSPECTIVE
by: NGUYEN THI QUI
Published: (2015)