Constraint-based planning with integrated production scheduler over internet
10.1061/(ASCE)0733-9364(2003)129:3(293)
Saved in:
Main Authors: | Chua, D.K.H., Shen, L.J., Bok, S.H. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/50682 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Key constraints analysis with integrated production scheduler
by: Chua, D.K.H., et al.
Published: (2014) -
Key constraint analysis: Achieve lean processes with the application of TOC
by: SHEN LIJUN, et al.
Published: (2014) -
A framework for construction requirements based planning utilizing constraints logic programming
by: Chua, D.K.H., et al.
Published: (2014) -
PDM++: Planning framework from a construction requirements perspective
by: Chua, D.K.H., et al.
Published: (2014) -
PDM++: Planning framework from a construction requirements perspective
by: Chua, D.K.H., et al.
Published: (2014)