Key constraints analysis with integrated production scheduler
10.1061/(ASCE)0733-9364(2005)131:7(753)
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/50708 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-50708 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-507082024-11-15T08:25:30Z Key constraints analysis with integrated production scheduler Chua, D.K.H. SHEN LIJUN CIVIL ENGINEERING Constraints Critical path method Lean construction Scheduling 10.1061/(ASCE)0733-9364(2005)131:7(753) Journal of Construction Engineering and Management 131 7 753-764 JCEMD 2014-04-23T07:08:30Z 2014-04-23T07:08:30Z 2005-07 Article Chua, D.K.H., SHEN LIJUN (2005-07). Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management 131 (7) : 753-764. ScholarBank@NUS Repository. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:7(753) 07339364 http://scholarbank.nus.edu.sg/handle/10635/50708 000230067000002 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
Constraints Critical path method Lean construction Scheduling |
spellingShingle |
Constraints Critical path method Lean construction Scheduling Chua, D.K.H. SHEN LIJUN Key constraints analysis with integrated production scheduler |
description |
10.1061/(ASCE)0733-9364(2005)131:7(753) |
author2 |
CIVIL ENGINEERING |
author_facet |
CIVIL ENGINEERING Chua, D.K.H. SHEN LIJUN |
format |
Article |
author |
Chua, D.K.H. SHEN LIJUN |
author_sort |
Chua, D.K.H. |
title |
Key constraints analysis with integrated production scheduler |
title_short |
Key constraints analysis with integrated production scheduler |
title_full |
Key constraints analysis with integrated production scheduler |
title_fullStr |
Key constraints analysis with integrated production scheduler |
title_full_unstemmed |
Key constraints analysis with integrated production scheduler |
title_sort |
key constraints analysis with integrated production scheduler |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/50708 |
_version_ |
1821202809778864128 |