Key constraints analysis with integrated production scheduler
10.1061/(ASCE)0733-9364(2005)131:7(753)
Saved in:
Main Authors: | Chua, D.K.H., SHEN LIJUN |
---|---|
其他作者: | CIVIL ENGINEERING |
格式: | Article |
出版: |
2014
|
主題: | |
在線閱讀: | http://scholarbank.nus.edu.sg/handle/10635/50708 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Key constraint analysis: Achieve lean processes with the application of TOC
由: SHEN LIJUN, et al.
出版: (2014) -
Constraint-based planning with integrated production scheduler over internet
由: Chua, D.K.H., et al.
出版: (2014) -
An investigation of critical chain and lean project scheduling
由: Shen, L., et al.
出版: (2014) -
AUTOMATED SCHEDULE GENERATION AND ANALYSIS FROM A CONSTRUCTION REQUIREMENT PERSPECTIVE
由: NGUYEN THI QUI
出版: (2015) -
Impact of variability on construction schedules
由: SHEN LIJUN, et al.
出版: (2014)