Key constraint analysis: Achieve lean processes with the application of TOC
Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress
Saved in:
Main Authors: | SHEN LIJUN, Chua, D.K.H. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/50780 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Key constraints analysis with integrated production scheduler
by: Chua, D.K.H., et al.
Published: (2014) -
An investigation of critical chain and lean project scheduling
by: Shen, L., et al.
Published: (2014) -
Impact of variability on construction schedules
by: SHEN LIJUN, et al.
Published: (2014) -
Constraint-based planning with integrated production scheduler over internet
by: Chua, D.K.H., et al.
Published: (2014) -
A framework for construction requirements based planning utilizing constraints logic programming
by: Chua, D.K.H., et al.
Published: (2014)