Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties
10.1016/j.cie.2013.07.006
Saved in:
Main Authors: | Le, C.V., Pang, C.K. |
---|---|
Other Authors: | ELECTRICAL & COMPUTER ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/56017 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Reactive repair tool for job shop schedules
by: Subramaniam, V., et al.
Published: (2014) -
Reactive recovery of job shop schedules - A review
by: Raheja, A.S., et al.
Published: (2014) -
Algorithms for scheduling problems with weighted earliness-tardiness penalty
by: FENG GUANG
Published: (2010) -
An integrated approach to reactive scheduling subject to machine breakdown
by: Wang, Y.F., et al.
Published: (2014) -
Reactive repair of job shop schedules
by: AMRITPAL SINGH RAHEJA
Published: (2011)