Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties
10.1016/j.cie.2013.07.006
Saved in:
Main Authors: | Le, C.V., Pang, C.K. |
---|---|
其他作者: | ELECTRICAL & COMPUTER ENGINEERING |
格式: | Article |
出版: |
2014
|
主題: | |
在線閱讀: | http://scholarbank.nus.edu.sg/handle/10635/56017 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | National University of Singapore |
相似書籍
-
Reactive repair tool for job shop schedules
由: Subramaniam, V., et al.
出版: (2014) -
Reactive recovery of job shop schedules - A review
由: Raheja, A.S., et al.
出版: (2014) -
Algorithms for scheduling problems with weighted earliness-tardiness penalty
由: FENG GUANG
出版: (2010) -
An integrated approach to reactive scheduling subject to machine breakdown
由: Wang, Y.F., et al.
出版: (2014) -
Reactive repair of job shop schedules
由: AMRITPAL SINGH RAHEJA
出版: (2011)