Increasing production rate in Kanban controlled assembly lines through preventive maintenance
10.1080/00207543.2011.551844
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/60516 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-60516 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-605162023-10-27T07:41:52Z Increasing production rate in Kanban controlled assembly lines through preventive maintenance Ruifeng, C. Subramaniam, V. MECHANICAL ENGINEERING assembly line decomposition Kanban Markov preventive maintenance unreliable machine 10.1080/00207543.2011.551844 International Journal of Production Research 50 4 991-1008 IJPRB 2014-06-17T06:24:08Z 2014-06-17T06:24:08Z 2012-02-15 Article Ruifeng, C., Subramaniam, V. (2012-02-15). Increasing production rate in Kanban controlled assembly lines through preventive maintenance. International Journal of Production Research 50 (4) : 991-1008. ScholarBank@NUS Repository. https://doi.org/10.1080/00207543.2011.551844 00207543 http://scholarbank.nus.edu.sg/handle/10635/60516 000303584500005 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
assembly line decomposition Kanban Markov preventive maintenance unreliable machine |
spellingShingle |
assembly line decomposition Kanban Markov preventive maintenance unreliable machine Ruifeng, C. Subramaniam, V. Increasing production rate in Kanban controlled assembly lines through preventive maintenance |
description |
10.1080/00207543.2011.551844 |
author2 |
MECHANICAL ENGINEERING |
author_facet |
MECHANICAL ENGINEERING Ruifeng, C. Subramaniam, V. |
format |
Article |
author |
Ruifeng, C. Subramaniam, V. |
author_sort |
Ruifeng, C. |
title |
Increasing production rate in Kanban controlled assembly lines through preventive maintenance |
title_short |
Increasing production rate in Kanban controlled assembly lines through preventive maintenance |
title_full |
Increasing production rate in Kanban controlled assembly lines through preventive maintenance |
title_fullStr |
Increasing production rate in Kanban controlled assembly lines through preventive maintenance |
title_full_unstemmed |
Increasing production rate in Kanban controlled assembly lines through preventive maintenance |
title_sort |
increasing production rate in kanban controlled assembly lines through preventive maintenance |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/60516 |
_version_ |
1781781859238150144 |