Increasing production rate in Kanban controlled assembly lines through preventive maintenance
10.1080/00207543.2011.551844
Saved in:
Main Authors: | Ruifeng, C., Subramaniam, V. |
---|---|
Other Authors: | MECHANICAL ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/60516 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Managing a Flow Line with Single-Kanban, Dual-Kanban or Conwip
by: YANG, Kum Khiong
Published: (2000) -
Analysis of a two-stage, flexible production system with unreliable machines, finite buffers and non-negligible setups
by: Senanayake, C.D., et al.
Published: (2014) -
Modeling the impact of Kanban design to cycle time, throughput and WIP in a high volume manufacturing system
by: Sio, Dhesirey Beryl Ko
Published: (2009) -
Development and application of a web-based kanban system
by: KHOO BOON BING
Published: (2010) -
Performance comparison of multiple product kanban control systems
by: Piplani, Rajesh, et al.
Published: (2019)