A simple recovery strategy for economic lot scheduling problem: A two-product case

10.1016/j.ijpe.2004.10.003

Saved in:
Bibliographic Details
Main Authors: Tang, L.C., Lee, L.H.
Other Authors: INDUSTRIAL & SYSTEMS ENGINEERING
Format: Article
Published: 2014
Subjects:
Online Access:http://scholarbank.nus.edu.sg/handle/10635/62952
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-62952
record_format dspace
spelling sg-nus-scholar.10635-629522023-10-26T20:41:09Z A simple recovery strategy for economic lot scheduling problem: A two-product case Tang, L.C. Lee, L.H. INDUSTRIAL & SYSTEMS ENGINEERING Economic lot scheduling Machine breakdowns Recovery strategy 10.1016/j.ijpe.2004.10.003 International Journal of Production Economics 98 1 97-107 IJPCE 2014-06-17T06:58:27Z 2014-06-17T06:58:27Z 2005-10-18 Article Tang, L.C., Lee, L.H. (2005-10-18). A simple recovery strategy for economic lot scheduling problem: A two-product case. International Journal of Production Economics 98 (1) : 97-107. ScholarBank@NUS Repository. https://doi.org/10.1016/j.ijpe.2004.10.003 09255273 http://scholarbank.nus.edu.sg/handle/10635/62952 000231302900006 Scopus
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
topic Economic lot scheduling
Machine breakdowns
Recovery strategy
spellingShingle Economic lot scheduling
Machine breakdowns
Recovery strategy
Tang, L.C.
Lee, L.H.
A simple recovery strategy for economic lot scheduling problem: A two-product case
description 10.1016/j.ijpe.2004.10.003
author2 INDUSTRIAL & SYSTEMS ENGINEERING
author_facet INDUSTRIAL & SYSTEMS ENGINEERING
Tang, L.C.
Lee, L.H.
format Article
author Tang, L.C.
Lee, L.H.
author_sort Tang, L.C.
title A simple recovery strategy for economic lot scheduling problem: A two-product case
title_short A simple recovery strategy for economic lot scheduling problem: A two-product case
title_full A simple recovery strategy for economic lot scheduling problem: A two-product case
title_fullStr A simple recovery strategy for economic lot scheduling problem: A two-product case
title_full_unstemmed A simple recovery strategy for economic lot scheduling problem: A two-product case
title_sort simple recovery strategy for economic lot scheduling problem: a two-product case
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/62952
_version_ 1781782169423708160