A simple recovery strategy for economic lot scheduling problem: A two-product case
10.1016/j.ijpe.2004.10.003
Saved in:
Main Authors: | Tang, L.C., Lee, L.H. |
---|---|
Other Authors: | INDUSTRIAL & SYSTEMS ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/62952 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Genetic algorithms for the multiple-machine economic lot scheduling problem
by: Sun, H., et al.
Published: (2014) -
Genetic algorithms for the multiple-machine economic lot scheduling problem
by: Sun, H., et al.
Published: (2014) -
On the economic lot scheduling problem
by: SUN HAINAN
Published: (2010) -
A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policy
by: Sun, H., et al.
Published: (2014) -
A study of the parking lot problem
by: Cinco, Jesus Rodriguez, et al.
Published: (1975)