Element maintenance and allocation for linear consecutively connected systems
10.1080/0740817X.2011.649388
Saved in:
Main Authors: | Peng, R., Xie, M., Ng, S.H., Levitin, G. |
---|---|
Other Authors: | INDUSTRIAL & SYSTEMS ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/63118 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
The consecutive ones submatrix problem for sparse matrices
by: Tan, J., et al.
Published: (2014) -
Gestational weight gain in consecutive pregnancies
by: Chin, J.R., et al.
Published: (2014) -
The IFR property for consecutive-k-out-of-n:F systems
by: Cui, L.
Published: (2014) -
Distributed fault-tolerant control of uncertain multi-agent systems with connectivity maintenance
by: Xing, Xueyan, et al.
Published: (2024) -
SHORT-TERM SENSITIZATION TO CONSECUTIVE AFFECTIVE IMAGES
by: YEAP JE SERN
Published: (2018)