Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel units
10.1016/j.compchemeng.2007.02.001
Saved in:
Main Authors: | Liu, Y., Karimi, I.A. |
---|---|
其他作者: | CHEMICAL & BIOMOLECULAR ENGINEERING |
格式: | Article |
出版: |
2014
|
主題: | |
在線閱讀: | http://scholarbank.nus.edu.sg/handle/10635/64303 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Novel continuous-time formulations for scheduling multi-stage multi-product batch plants with identical parallel units
由: Liu, Y., et al.
出版: (2014) -
A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel units
由: Liu, Y., et al.
出版: (2014) -
Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storage
由: Liu, Y., et al.
出版: (2014) -
Scheduling of multi-stage multi-product batch plants with parallel units
由: LIU YU
出版: (2010) -
Scheduling multistage batch plants with parallel units and no interstage storage
由: Liu, Y., et al.
出版: (2014)