A two-stage equipment predictive maintenance framework for high-performance manufacturing systems
10.1109/ICIEA.2012.6360931
Saved in:
Main Authors: | Hu, B., Pang, C.K., Luo, M., Li, X., Chan, H.L. |
---|---|
Other Authors: | ELECTRICAL & COMPUTER ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/69114 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
A PILOT STUDY OF PREDICTIVE MAINTENANCE IN SEMICONDUCTOR MANUFACTURING
by: HE LIWEI
Published: (2019) -
A mixed time-/condition-based precognitive maintenance framework using support vectors
by: Pang, C.K., et al.
Published: (2014) -
Preventive maintenance system of heavy equipment in horizontal construction.
by: Abano, Jeremy Jacob Y., et al.
Published: (2002) -
Digital twin-enhanced predictive maintenance for indoor climate: a parallel LSTM-autoencoder failure prediction approach
by: Hu, Wei, et al.
Published: (2024) -
Optimal preventive maintenance of leased equipment
by: Jarumon Jaturonnatee
Published: (2006)