A study of analogy based sampling for interval based cost estimation for software project management
10.1109/ICMIT.2008.4654377
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/72258 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-72258 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-722582015-02-17T04:53:27Z A study of analogy based sampling for interval based cost estimation for software project management Li, Y.F. Xie, M. Goh, T.N. INDUSTRIAL & SYSTEMS ENGINEERING Analogy based estimation Interval estimation Software cost estimation Software project management 10.1109/ICMIT.2008.4654377 Proceedings of the 4th IEEE International Conference on Management of Innovation and Technology, ICMIT 281-286 2014-06-19T04:52:53Z 2014-06-19T04:52:53Z 2008 Conference Paper Li, Y.F.,Xie, M.,Goh, T.N. (2008). A study of analogy based sampling for interval based cost estimation for software project management. Proceedings of the 4th IEEE International Conference on Management of Innovation and Technology, ICMIT : 281-286. ScholarBank@NUS Repository. <a href="https://doi.org/10.1109/ICMIT.2008.4654377" target="_blank">https://doi.org/10.1109/ICMIT.2008.4654377</a> 9781424423309 http://scholarbank.nus.edu.sg/handle/10635/72258 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
country |
Singapore |
collection |
ScholarBank@NUS |
topic |
Analogy based estimation Interval estimation Software cost estimation Software project management |
spellingShingle |
Analogy based estimation Interval estimation Software cost estimation Software project management Li, Y.F. Xie, M. Goh, T.N. A study of analogy based sampling for interval based cost estimation for software project management |
description |
10.1109/ICMIT.2008.4654377 |
author2 |
INDUSTRIAL & SYSTEMS ENGINEERING |
author_facet |
INDUSTRIAL & SYSTEMS ENGINEERING Li, Y.F. Xie, M. Goh, T.N. |
format |
Conference or Workshop Item |
author |
Li, Y.F. Xie, M. Goh, T.N. |
author_sort |
Li, Y.F. |
title |
A study of analogy based sampling for interval based cost estimation for software project management |
title_short |
A study of analogy based sampling for interval based cost estimation for software project management |
title_full |
A study of analogy based sampling for interval based cost estimation for software project management |
title_fullStr |
A study of analogy based sampling for interval based cost estimation for software project management |
title_full_unstemmed |
A study of analogy based sampling for interval based cost estimation for software project management |
title_sort |
study of analogy based sampling for interval based cost estimation for software project management |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/72258 |
_version_ |
1681087533102923776 |