Human resource planning with worker attendance uncertainty
10.1109/IEEM.2008.4737892
Saved in:
Main Authors: | Ng, T.S., Huang, H.C., Ng, J.Y. |
---|---|
Other Authors: | INDUSTRIAL & SYSTEMS ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/72336 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
A successive convex approximation method for multistage workforce capacity planning problem with turnover
by: Song, H., et al.
Published: (2014) -
DLSU faculty attendance monitoring system
by: Lao, Eriene, et al.
Published: (1986) -
Reducing parameter uncertainty for stochastic systems
by: Ng, S.H., et al.
Published: (2014) -
DEVELOPING AND CONDUCTING A POLICY-RELEVANT EVALUATION OF A MDR-TB HEALTHCARE PROVIDER TRAINING PROGRAM TO INFORM FUTURE DECISIONS ON RESOURCE ALLOCATION IN CHINA
by: WU SHISHI
Published: (2020) -
Liner ship fleet planning with uncertain container shipment demand
by: WANG TING SONG
Published: (2012)