An integrated approach to reactive scheduling subject to machine breakdown
10.1109/ICAL.2008.4636210
Saved in:
Main Authors: | , , , , , |
---|---|
Other Authors: | |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/73177 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-73177 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-731772024-11-08T20:41:06Z An integrated approach to reactive scheduling subject to machine breakdown Wang, Y.F. Zhang, Y.F. Fuh, J.Y.H. Zhou, Z.D. Lou, P. Xue, L.G. MECHANICAL ENGINEERING Integration of process planning and scheduling Machine breakdown Reactive scheduling 10.1109/ICAL.2008.4636210 Proceedings of the IEEE International Conference on Automation and Logistics, ICAL 2008 542-547 2014-06-19T05:32:03Z 2014-06-19T05:32:03Z 2008 Conference Paper Wang, Y.F., Zhang, Y.F., Fuh, J.Y.H., Zhou, Z.D., Lou, P., Xue, L.G. (2008). An integrated approach to reactive scheduling subject to machine breakdown. Proceedings of the IEEE International Conference on Automation and Logistics, ICAL 2008 : 542-547. ScholarBank@NUS Repository. https://doi.org/10.1109/ICAL.2008.4636210 9781424425020 http://scholarbank.nus.edu.sg/handle/10635/73177 000263554800102 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
Integration of process planning and scheduling Machine breakdown Reactive scheduling |
spellingShingle |
Integration of process planning and scheduling Machine breakdown Reactive scheduling Wang, Y.F. Zhang, Y.F. Fuh, J.Y.H. Zhou, Z.D. Lou, P. Xue, L.G. An integrated approach to reactive scheduling subject to machine breakdown |
description |
10.1109/ICAL.2008.4636210 |
author2 |
MECHANICAL ENGINEERING |
author_facet |
MECHANICAL ENGINEERING Wang, Y.F. Zhang, Y.F. Fuh, J.Y.H. Zhou, Z.D. Lou, P. Xue, L.G. |
format |
Conference or Workshop Item |
author |
Wang, Y.F. Zhang, Y.F. Fuh, J.Y.H. Zhou, Z.D. Lou, P. Xue, L.G. |
author_sort |
Wang, Y.F. |
title |
An integrated approach to reactive scheduling subject to machine breakdown |
title_short |
An integrated approach to reactive scheduling subject to machine breakdown |
title_full |
An integrated approach to reactive scheduling subject to machine breakdown |
title_fullStr |
An integrated approach to reactive scheduling subject to machine breakdown |
title_full_unstemmed |
An integrated approach to reactive scheduling subject to machine breakdown |
title_sort |
integrated approach to reactive scheduling subject to machine breakdown |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/73177 |
_version_ |
1821194070003810304 |