An integrated approach to reactive scheduling subject to machine breakdown
10.1109/ICAL.2008.4636210
Saved in:
Main Authors: | Wang, Y.F., Zhang, Y.F., Fuh, J.Y.H., Zhou, Z.D., Lou, P., Xue, L.G. |
---|---|
Other Authors: | MECHANICAL ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/73177 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Job rescheduling by exploring the solution space of process planning for machine breakdown/arrival problemsg
by: Wang, Y.F., et al.
Published: (2014) -
Reducing tardy jobs by integrating process planning and scheduling functions
by: Wang, J., et al.
Published: (2014) -
An agent-based distributed process planning and scheduling system
by: Wang, Y.F., et al.
Published: (2014) -
Reactive repair tool for job shop schedules
by: Subramaniam, V., et al.
Published: (2014) -
Reactive recovery of job shop schedules - A review
by: Raheja, A.S., et al.
Published: (2014)