Coordinated production scheduling of prefabricated building components

Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress

Saved in:
Bibliographic Details
Main Authors: Chan, W.-T., Zeng, Z.
Other Authors: CIVIL ENGINEERING
Format: Conference or Workshop Item
Published: 2014
Online Access:http://scholarbank.nus.edu.sg/handle/10635/74115
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-74115
record_format dspace
spelling sg-nus-scholar.10635-741152024-11-08T19:04:09Z Coordinated production scheduling of prefabricated building components Chan, W.-T. Zeng, Z. CIVIL ENGINEERING Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress 909-916 2014-06-19T05:49:08Z 2014-06-19T05:49:08Z 2003 Conference Paper Chan, W.-T., Zeng, Z. (2003). Coordinated production scheduling of prefabricated building components. Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress : 909-916. ScholarBank@NUS Repository. 0784406715 http://scholarbank.nus.edu.sg/handle/10635/74115 NOT_IN_WOS Scopus
institution National University of Singapore
building NUS Library
continent Asia
country Singapore
Singapore
content_provider NUS Library
collection ScholarBank@NUS
description Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress
author2 CIVIL ENGINEERING
author_facet CIVIL ENGINEERING
Chan, W.-T.
Zeng, Z.
format Conference or Workshop Item
author Chan, W.-T.
Zeng, Z.
spellingShingle Chan, W.-T.
Zeng, Z.
Coordinated production scheduling of prefabricated building components
author_sort Chan, W.-T.
title Coordinated production scheduling of prefabricated building components
title_short Coordinated production scheduling of prefabricated building components
title_full Coordinated production scheduling of prefabricated building components
title_fullStr Coordinated production scheduling of prefabricated building components
title_full_unstemmed Coordinated production scheduling of prefabricated building components
title_sort coordinated production scheduling of prefabricated building components
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/74115
_version_ 1821229221778817024