Coordinated production scheduling of prefabricated building components
Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress
Saved in:
Main Authors: | Chan, W.-T., Zeng, Z. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/74115 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Integrated prefabrication configuration and component grouping for resource optimization of precast production
by: Khalili, A., et al.
Published: (2014) -
AN INVESTIGATION ON THE LEVELS OF INTEGRATION FOR FAçADE LAYERS AND PREFABRICATED COMPONENTS IN RELATIONSHIPS WITH THE HEIGHT OF BUILDING
by: CHUNG CHIA LING
Published: (2011) -
Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production
by: Han, Jinchi, et al.
Published: (2024) -
Ordering Strategy Analysis of Prefabricated Component Manufacturer in Construction Supply Chain
by: Yang, H, et al.
Published: (2020) -
BUILDING INFORMATION MODELLING (BIM) BASED PREFABRICATION
by: GOH ZHEN SHEN
Published: (2017)