Reduced duration of the design projects with the concept of early estimation of design tasks
Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/74321 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-74321 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-743212015-02-28T19:51:12Z Reduced duration of the design projects with the concept of early estimation of design tasks Chua, D.K.H. Hossain, Md.A. CIVIL ENGINEERING Design process Early estimation Reduced duration Rework Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction 485-494 2014-06-19T05:51:35Z 2014-06-19T05:51:35Z 2008 Conference Paper Chua, D.K.H.,Hossain, Md.A. (2008). Reduced duration of the design projects with the concept of early estimation of design tasks. Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction : 485-494. ScholarBank@NUS Repository. 9781905732456 http://scholarbank.nus.edu.sg/handle/10635/74321 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
country |
Singapore |
collection |
ScholarBank@NUS |
topic |
Design process Early estimation Reduced duration Rework |
spellingShingle |
Design process Early estimation Reduced duration Rework Chua, D.K.H. Hossain, Md.A. Reduced duration of the design projects with the concept of early estimation of design tasks |
description |
Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction |
author2 |
CIVIL ENGINEERING |
author_facet |
CIVIL ENGINEERING Chua, D.K.H. Hossain, Md.A. |
format |
Conference or Workshop Item |
author |
Chua, D.K.H. Hossain, Md.A. |
author_sort |
Chua, D.K.H. |
title |
Reduced duration of the design projects with the concept of early estimation of design tasks |
title_short |
Reduced duration of the design projects with the concept of early estimation of design tasks |
title_full |
Reduced duration of the design projects with the concept of early estimation of design tasks |
title_fullStr |
Reduced duration of the design projects with the concept of early estimation of design tasks |
title_full_unstemmed |
Reduced duration of the design projects with the concept of early estimation of design tasks |
title_sort |
reduced duration of the design projects with the concept of early estimation of design tasks |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/74321 |
_version_ |
1681087908213161984 |