Reduced duration of the design projects with the concept of early estimation of design tasks
Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction
Saved in:
Main Authors: | Chua, D.K.H., Hossain, Md.A. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/74321 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
A simulation model to study the impact of early information on design duration and redesign
by: Chua, D.K.H., et al.
Published: (2014) -
Simulation-based model for handling iteration and feedback loop in design
by: Hossain, Md.A., et al.
Published: (2014) -
Identifying key sources of rework affecting construction cost performance
by: Hwang, B.-G.
Published: (2013) -
On discretisable formulas in duration calculus
by: Pham, Hong Thai
Published: (2017) -
Enhancing rework techniques in microelectronics components for reusability
by: Toh, Wei Yu
Published: (2024)