Rescheduling precast production with multiobjective optimization
Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/74331 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-74331 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-743312021-10-25T09:02:58Z Rescheduling precast production with multiobjective optimization Chan, W.-T. Zeng, Z. CIVIL ENGINEERING Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering 1777-1786 2014-06-19T05:51:42Z 2014-06-19T05:51:42Z 2005 Chan, W.-T., Zeng, Z. (2005). Rescheduling precast production with multiobjective optimization. Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering : 1777-1786. ScholarBank@NUS Repository. 0784407940 http://scholarbank.nus.edu.sg/handle/10635/74331 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
description |
Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering |
author2 |
CIVIL ENGINEERING |
author_facet |
CIVIL ENGINEERING Chan, W.-T. Zeng, Z. |
author |
Chan, W.-T. Zeng, Z. |
spellingShingle |
Chan, W.-T. Zeng, Z. Rescheduling precast production with multiobjective optimization |
author_sort |
Chan, W.-T. |
title |
Rescheduling precast production with multiobjective optimization |
title_short |
Rescheduling precast production with multiobjective optimization |
title_full |
Rescheduling precast production with multiobjective optimization |
title_fullStr |
Rescheduling precast production with multiobjective optimization |
title_full_unstemmed |
Rescheduling precast production with multiobjective optimization |
title_sort |
rescheduling precast production with multiobjective optimization |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/74331 |
_version_ |
1715195380938833920 |