Rescheduling precast production with multiobjective optimization

Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering

Saved in:
Bibliographic Details
Main Authors: Chan, W.-T., Zeng, Z.
Other Authors: CIVIL ENGINEERING
Published: 2014
Online Access:http://scholarbank.nus.edu.sg/handle/10635/74331
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
Be the first to leave a comment!
You must be logged in first