Simulation-based planning for precast production with two critical resources
10.1109/WSC.2007.4419843
Saved in:
Main Authors: | Zhai, X., Tiongz, R.L.K., Bjornsson, H.C., Chua, D.K.H. |
---|---|
Other Authors: | CIVIL ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/74353 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Simulation-based planning for precast production with two critical resources
by: Zhai, X., et al.
Published: (2014) -
A simulation-ga based model for production planning in precast plant
by: Zhai, X., et al.
Published: (2014) -
Integrated planning and scheduling for precast concrete production
by: Zhai, Xiaofeng
Published: (2008) -
Integrated prefabrication configuration and component grouping for resource optimization of precast production
by: Khalili, A., et al.
Published: (2014) -
PENERAPAN APLIKASI WASKITA BETON PRECAST ENTREPRISE RESOURCE PLANNING (WSBPERP) PADA DEPARTEMEN KEUANGAN PT WASKITA BETON PRECAST, Tbk
by: WIDHI ASTUTI SEKARNINGRUM, 151511013046
Published: (2018)