Robust Execution Strategy for Scheduling Under Uncertainity
Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max) provides a general model for resource scheduling in many real-world problems (such as manufacturing and construction engineering). Due to its practical importance and generality, providing effective algor...
Saved in:
Main Author: | FU, Na |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2012
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/etd_coll/82 https://ink.library.smu.edu.sg/cgi/viewcontent.cgi?article=1081&context=etd_coll |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
DATA-DRIVEN MODELS FOR SCHEDULING OPTIMIZATION UNDER UNCERTAINTY
by: WANG ZHIGUO
Published: (2019) -
Robust execution strategies for project scheduling with unreliable resources and stochastic durations
by: FU, Na, et al.
Published: (2015) -
A robust optimization approach for energy generation scheduling in microgrids
by: Wang, Ran, et al.
Published: (2016) -
Mechanism design for strategic project scheduling
by: VARAKANTHAM, Pradeep, et al.
Published: (2017) -
OPTIMIZATION UNDER UNCERTAINTY USING EXPONENTIAL CONES
by: CHEN LI
Published: (2022)