Enabling sustainable mining via AI-based techniques
The precedence-constrained production scheduling problem (PCPSP) in Long-Term Mine Planning (LTMP) is NP-hard and conventionally prioritizes the Net Present Value (NPV) of profits. Even so, heightened sustainability concerns necessitate heightened sustainable practices. Yet, research still lags. Thi...
Saved in:
Main Author: | AZHAR, Nurul Asyikeen Binte |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2024
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/etd_coll/587 https://ink.library.smu.edu.sg/context/etd_coll/article/1585/viewcontent/GPEN_AY2020_EngD_Nurul_Asyikeen_Binte_Azhar.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
Carbon-aware mine planning with a novel multi-objective framework
by: NURUL ASYIKEEN BINTE AZHAR,, et al.
Published: (2023) -
Improved multi-objective evolutionary algorithm for day-ahead thermal generation scheduling
by: Trivedi, A., et al.
Published: (2014) -
Finding robust-under-risk solutions for flowshop scheduling
by: Kimbrough, Steven O., et al.
Published: (2011) -
An investigation on noisy environments in evolutionary multi-objective optimization
by: Goh, C.K., et al.
Published: (2014) -
A novel multi-objective directed bee colony optimization algorithm for multi-objective emission constrained economic power dispatch
by: Kumar, R., et al.
Published: (2014)