Performance based contracting for the manufacturing industry by using integrated platform and dynamic pricing model
Although Performance Based Contracting (PBC) concept is not totally new, the PBC adaptation in Industrial Machinery and Components (IMC) manufacturing, which produces high-value and long life machineries, is rather slow and it is done with extra caution. Three main concerns for manufacturers to impl...
Saved in:
Main Authors: | , |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2016
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/5137 https://ink.library.smu.edu.sg/context/lkcsb_research/article/6136/viewcontent/Performance_Based_Contracting_for_the_manufacturing_industry_by_using_integrated_platform_and_dynamic_pricing_model.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
id |
sg-smu-ink.lkcsb_research-6136 |
---|---|
record_format |
dspace |
spelling |
sg-smu-ink.lkcsb_research-61362022-07-27T09:06:34Z Performance based contracting for the manufacturing industry by using integrated platform and dynamic pricing model LINDAWATI, GUNAWAN, Aldy Although Performance Based Contracting (PBC) concept is not totally new, the PBC adaptation in Industrial Machinery and Components (IMC) manufacturing, which produces high-value and long life machineries, is rather slow and it is done with extra caution. Three main concerns for manufacturers to implement PBC are the investment cost, the maintenance cost and possible revenue loss. To handle these concerns and accelerate the PBC implementation, we propose an integrated platform that consists of three components: dynamic pricing, sensor data feeding and machinery monitoring. We model the dynamic pricing as an optimization problem and propose Genetic Algorithm to solve the problem. We run the experiment on generated data and show that GA provides a good pricing solution with average difference of 5.64% from the traditional fixed leasing price. 2016-01-01T08:00:00Z text application/pdf https://ink.library.smu.edu.sg/lkcsb_research/5137 info:doi/10.1109/IEEM.2015.7385913 https://ink.library.smu.edu.sg/context/lkcsb_research/article/6136/viewcontent/Performance_Based_Contracting_for_the_manufacturing_industry_by_using_integrated_platform_and_dynamic_pricing_model.pdf http://creativecommons.org/licenses/by-nc-nd/4.0/ Research Collection Lee Kong Chian School Of Business eng Institutional Knowledge at Singapore Management University dynamic pricing genetic algorithm industrial machinery and components manufacturing integrated platform performance based contracting Operations Research, Systems Engineering and Industrial Engineering Theory and Algorithms |
institution |
Singapore Management University |
building |
SMU Libraries |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
SMU Libraries |
collection |
InK@SMU |
language |
English |
topic |
dynamic pricing genetic algorithm industrial machinery and components manufacturing integrated platform performance based contracting Operations Research, Systems Engineering and Industrial Engineering Theory and Algorithms |
spellingShingle |
dynamic pricing genetic algorithm industrial machinery and components manufacturing integrated platform performance based contracting Operations Research, Systems Engineering and Industrial Engineering Theory and Algorithms LINDAWATI, GUNAWAN, Aldy Performance based contracting for the manufacturing industry by using integrated platform and dynamic pricing model |
description |
Although Performance Based Contracting (PBC) concept is not totally new, the PBC adaptation in Industrial Machinery and Components (IMC) manufacturing, which produces high-value and long life machineries, is rather slow and it is done with extra caution. Three main concerns for manufacturers to implement PBC are the investment cost, the maintenance cost and possible revenue loss. To handle these concerns and accelerate the PBC implementation, we propose an integrated platform that consists of three components: dynamic pricing, sensor data feeding and machinery monitoring. We model the dynamic pricing as an optimization problem and propose Genetic Algorithm to solve the problem. We run the experiment on generated data and show that GA provides a good pricing solution with average difference of 5.64% from the traditional fixed leasing price. |
format |
text |
author |
LINDAWATI, GUNAWAN, Aldy |
author_facet |
LINDAWATI, GUNAWAN, Aldy |
author_sort |
LINDAWATI, |
title |
Performance based contracting for the manufacturing industry by using integrated platform and dynamic pricing model |
title_short |
Performance based contracting for the manufacturing industry by using integrated platform and dynamic pricing model |
title_full |
Performance based contracting for the manufacturing industry by using integrated platform and dynamic pricing model |
title_fullStr |
Performance based contracting for the manufacturing industry by using integrated platform and dynamic pricing model |
title_full_unstemmed |
Performance based contracting for the manufacturing industry by using integrated platform and dynamic pricing model |
title_sort |
performance based contracting for the manufacturing industry by using integrated platform and dynamic pricing model |
publisher |
Institutional Knowledge at Singapore Management University |
publishDate |
2016 |
url |
https://ink.library.smu.edu.sg/lkcsb_research/5137 https://ink.library.smu.edu.sg/context/lkcsb_research/article/6136/viewcontent/Performance_Based_Contracting_for_the_manufacturing_industry_by_using_integrated_platform_and_dynamic_pricing_model.pdf |
_version_ |
1770573327462563840 |