A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al.
The great variety of project scheduling problems studied in the ever growing literature motivated the recent development of classification schemes. In a recent paper (European Journal of Operational Research 112 (1999) 3–41), Brucker et al. make the claim that, so far, no classification scheme exist...
Saved in:
Main Authors: | , , |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2001
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/6747 https://ink.library.smu.edu.sg/context/lkcsb_research/article/7758/viewcontent/1_s2.0_S0377221799003926_main.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
id |
sg-smu-ink.lkcsb_research-7758 |
---|---|
record_format |
dspace |
spelling |
sg-smu-ink.lkcsb_research-77582021-08-31T11:10:48Z A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. HERROELEN, Willy DEMEULEMEESTER, Erik DE REYCK, Bert The great variety of project scheduling problems studied in the ever growing literature motivated the recent development of classification schemes. In a recent paper (European Journal of Operational Research 112 (1999) 3–41), Brucker et al. make the claim that, so far, no classification scheme exists which is compatible with what is commonly accepted in machine scheduling and introduce a new classification. In this note, we critically review major shortcomings of the suggested scheme which place heavy limitations on its potential use. 2001-02-01T08:00:00Z text application/pdf https://ink.library.smu.edu.sg/lkcsb_research/6747 info:doi/10.1016/S0377-2217(99)00392-6 https://ink.library.smu.edu.sg/context/lkcsb_research/article/7758/viewcontent/1_s2.0_S0377221799003926_main.pdf http://creativecommons.org/licenses/by-nc-nd/4.0/ Research Collection Lee Kong Chian School Of Business eng Institutional Knowledge at Singapore Management University Project scheduling Machine scheduling Classification scheme Business Administration, Management, and Operations Management Information Systems |
institution |
Singapore Management University |
building |
SMU Libraries |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
SMU Libraries |
collection |
InK@SMU |
language |
English |
topic |
Project scheduling Machine scheduling Classification scheme Business Administration, Management, and Operations Management Information Systems |
spellingShingle |
Project scheduling Machine scheduling Classification scheme Business Administration, Management, and Operations Management Information Systems HERROELEN, Willy DEMEULEMEESTER, Erik DE REYCK, Bert A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. |
description |
The great variety of project scheduling problems studied in the ever growing literature motivated the recent development of classification schemes. In a recent paper (European Journal of Operational Research 112 (1999) 3–41), Brucker et al. make the claim that, so far, no classification scheme exists which is compatible with what is commonly accepted in machine scheduling and introduce a new classification. In this note, we critically review major shortcomings of the suggested scheme which place heavy limitations on its potential use. |
format |
text |
author |
HERROELEN, Willy DEMEULEMEESTER, Erik DE REYCK, Bert |
author_facet |
HERROELEN, Willy DEMEULEMEESTER, Erik DE REYCK, Bert |
author_sort |
HERROELEN, Willy |
title |
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. |
title_short |
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. |
title_full |
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. |
title_fullStr |
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. |
title_full_unstemmed |
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. |
title_sort |
note on the paper “resource-constrained project scheduling: notation, classification, models and methods” by brucker et al. |
publisher |
Institutional Knowledge at Singapore Management University |
publishDate |
2001 |
url |
https://ink.library.smu.edu.sg/lkcsb_research/6747 https://ink.library.smu.edu.sg/context/lkcsb_research/article/7758/viewcontent/1_s2.0_S0377221799003926_main.pdf |
_version_ |
1770575769380061184 |