A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al.
The great variety of project scheduling problems studied in the ever growing literature motivated the recent development of classification schemes. In a recent paper (European Journal of Operational Research 112 (1999) 3–41), Brucker et al. make the claim that, so far, no classification scheme exist...
Saved in:
Main Authors: | HERROELEN, Willy, DEMEULEMEESTER, Erik, DE REYCK, Bert |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2001
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/6747 https://ink.library.smu.edu.sg/context/lkcsb_research/article/7758/viewcontent/1_s2.0_S0377221799003926_main.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
Resource-constrained project scheduling: A survey of recent developments
by: HERROELEN, Willy, et al.
Published: (1996) -
A classification scheme for project scheduling problems
by: HERROELEN, Willy, et al.
Published: (1999) -
Algorithms for scheduling projects with generalized precedence relations
by: DE REYCK, Bert, et al.
Published: (1999) -
On a paper by Christofides et al. for solving the multiple-resource constrained, single project scheduling problem
by: Demeulemeester, E., et al.
Published: (2013) -
The multi– mode resource– constrained project scheduling problem with generalized precedence relations
by: DE REYCK, Bert, et al.
Published: (1999)