A classification scheme for project scheduling problems
The basic concern of scheduling is commonly described as the allocation of limited resources to tasks over time (Lawler et al. 1993, Pinedo 1995). The resources and tasks may take many forms. In project scheduling the tasks refer to the activities belonging to one or more projects. The execution of...
Saved in:
Main Authors: | HERROELEN, Willy, DEMEULEMEESTER, Erik, DE REYCK, Bert |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
1999
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/6771 https://ink.library.smu.edu.sg/context/lkcsb_research/article/7770/viewcontent/10.1007_978_1_4615_5533_9.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
Resource-constrained project scheduling: A survey of recent developments
by: HERROELEN, Willy, et al.
Published: (1996) -
Algorithms for scheduling projects with generalized precedence relations
by: DE REYCK, Bert, et al.
Published: (1999) -
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al.
by: HERROELEN, Willy, et al.
Published: (2001) -
The multi– mode resource– constrained project scheduling problem with generalized precedence relations
by: DE REYCK, Bert, et al.
Published: (1999) -
Phase transitions in project scheduling
by: HERROELEN, Willy, et al.
Published: (1999)