A proactive sampling approach to project scheduling under uncertainty

Uncertainty in activity durations is a key characteristic of many real world scheduling problems in manufacturing, logistics and project management. RCPSP/max with durational uncertainty is a general model that can be used to represent durational uncertainty in a wide variety of scheduling problems...

Full description

Saved in:
Bibliographic Details
Main Authors: Pradeep VARAKANTHAM, FU, Na, LAU, Hoong Chuin
Format: text
Language:English
Published: Institutional Knowledge at Singapore Management University 2016
Subjects:
Online Access:https://ink.library.smu.edu.sg/sis_research/3342
https://ink.library.smu.edu.sg/context/sis_research/article/4344/viewcontent/AProactiveSamplingApproachProject.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Singapore Management University
Language: English
Description
Summary:Uncertainty in activity durations is a key characteristic of many real world scheduling problems in manufacturing, logistics and project management. RCPSP/max with durational uncertainty is a general model that can be used to represent durational uncertainty in a wide variety of scheduling problems where there exist resource constraints. However, computing schedules or execution strategies for RCPSP/max with durational uncertainty is NP-hard and hence we focus on providing approximation methods in this paper. We pro- vide a principled approximation approach based on Sample Average Approximation (SAA) to compute proactive schedules for RCPSP/max with durational uncertainty. We further contribute an extension to SAA for improving scalability significantly without sacrificing on solution quality. Not only is our approach able to compute schedules at comparable runtimes as existing approaches, it also provides lower α-quantile makespan (also referred to as α-robust makespan) values than the best known approach on benchmark problems from the literature.