A proactive sampling approach to project scheduling under uncertainty
Uncertainty in activity durations is a key characteristic of many real world scheduling problems in manufacturing, logistics and project management. RCPSP/max with durational uncertainty is a general model that can be used to represent durational uncertainty in a wide variety of scheduling problems...
محفوظ في:
المؤلفون الرئيسيون: | Pradeep VARAKANTHAM, FU, Na, LAU, Hoong Chuin |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Institutional Knowledge at Singapore Management University
2016
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ink.library.smu.edu.sg/sis_research/3342 https://ink.library.smu.edu.sg/context/sis_research/article/4344/viewcontent/AProactiveSamplingApproachProject.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Singapore Management University |
اللغة: | English |
مواد مشابهة
-
Towards finding robust execution strategies for RCPSP/max with durational uncertainty
بواسطة: FU, Na, وآخرون
منشور في: (2010) -
auction with rolling horizon for urban consolidation centre
بواسطة: WANG, Chen, وآخرون
منشور في: (2014) -
Achieving stable and fair profit allocation with minimum subsidy in collaborative logistics
بواسطة: AGUSSURJA, Lucas, وآخرون
منشور في: (2016) -
Robust Local Search for Solving RCPSP/max with Durational Uncertainty
بواسطة: FU, Na, وآخرون
منشور في: (2012) -
Collaborative model and algorithms for supporting real-time distribution logistics systems
بواسطة: LAU, Hoong Chuin, وآخرون
منشور في: (2000)