Carbon-aware mine planning with a novel multi-objective framework
The logistical complication of long-term mine planning involves deciding the sequential extraction of materials from the mine pit and their subsequent processing steps based on geological, geometrical, and resource constraints. The net present value (NPV) of profit over the mine's lifespan usua...
محفوظ في:
المؤلفون الرئيسيون: | NURUL ASYIKEEN BINTE AZHAR, GUNAWAN, Aldy, CHENG, Shih-Fen, LEONARDI, Erwin |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Institutional Knowledge at Singapore Management University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ink.library.smu.edu.sg/sis_research/8074 https://ink.library.smu.edu.sg/context/sis_research/article/9077/viewcontent/iccl2023.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Singapore Management University |
اللغة: | English |
مواد مشابهة
-
Enabling sustainable mining via AI-based techniques
بواسطة: AZHAR, Nurul Asyikeen Binte
منشور في: (2024) -
Improved multi-objective evolutionary algorithm for day-ahead thermal generation scheduling
بواسطة: Trivedi, A., وآخرون
منشور في: (2014) -
Comparison of evolutionary algorithms: A case study on the multi-objective carbon-aware mine planning
بواسطة: NURUL ASYIKEEN BINTE AZHAR,, وآخرون
منشور في: (2024) -
A carbon-aware planning framework for production scheduling in mining
بواسطة: AZHAR, Nurual Asyikeen, وآخرون
منشور في: (2022) -
An investigation on noisy environments in evolutionary multi-objective optimization
بواسطة: Goh, C.K., وآخرون
منشور في: (2014)