Carbon-aware mine planning with a novel multi-objective framework
The logistical complication of long-term mine planning involves deciding the sequential extraction of materials from the mine pit and their subsequent processing steps based on geological, geometrical, and resource constraints. The net present value (NPV) of profit over the mine's lifespan usua...
Saved in:
Main Authors: | NURUL ASYIKEEN BINTE AZHAR, GUNAWAN, Aldy, CHENG, Shih-Fen, LEONARDI, Erwin |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2023
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/sis_research/8074 https://ink.library.smu.edu.sg/context/sis_research/article/9077/viewcontent/iccl2023.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
Enabling sustainable mining via AI-based techniques
by: AZHAR, Nurul Asyikeen Binte
Published: (2024) -
Comparison of evolutionary algorithms: A case study on the multi-objective carbon-aware mine planning
by: NURUL ASYIKEEN BINTE AZHAR,, et al.
Published: (2024) -
A carbon-aware planning framework for production scheduling in mining
by: AZHAR, Nurual Asyikeen, et al.
Published: (2022) -
Improved multi-objective evolutionary algorithm for day-ahead thermal generation scheduling
by: Trivedi, A., et al.
Published: (2014) -
An investigation on noisy environments in evolutionary multi-objective optimization
by: Goh, C.K., et al.
Published: (2014)