Developing overall equipment cost loss indicator
This research has an objective to create the new indicator for evaluating the performance and efficiency of the machine. This indicator is built as purpose to solve the problems that occurred in Overall Equipment Effectiveness (OEE) indicator. OEE is the main indicator of TPM, which focuses on machi...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
Springer Verlag
2015
|
Subjects: | |
Online Access: | http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84903840618&origin=inward http://cmuir.cmu.ac.th/handle/6653943832/39245 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
id |
th-cmuir.6653943832-39245 |
---|---|
record_format |
dspace |
spelling |
th-cmuir.6653943832-392452015-06-16T08:19:39Z Developing overall equipment cost loss indicator Wudhikarn R. Smithikul C. Manopiniwes W. Control and Systems Engineering Computer Science (all) This research has an objective to create the new indicator for evaluating the performance and efficiency of the machine. This indicator is built as purpose to solve the problems that occurred in Overall Equipment Effectiveness (OEE) indicator. OEE is the main indicator of TPM, which focuses on machine maintenance. This indicator emphasizes how to find loss in the machine with no consideration of production cost. As considering the priority between the machine without regarding the machine capacity, production cost and value of the products, it could cause the improper priority to the machine. Therefore, the researcher has built a new indicator and also implemented with fibre cement manufacturing company. In the case study that the machine had been implemented, the result represented that the machine which had the highest OEE at 76.7%, was not the machine that had the lowest production cost loss value. The machine's overall production loss value costs 25.01 million baht. The machine that has even the least production loss value costs 2.28 million baht has the OEE only 71.7%. This OEE is the lowest in all of machines. The data represents that the OEE cannot sequence the problems appropriately because of the differences of the machines, including production capacity, production cost and the value of the products. These all differences will directly affect to the production loss value of each machine. Consequently, the new indicator in this research has been built to solve these OEE problems. This indicator can sequence the problems of each machine by calculating the production loss and represents the results as the monetary unit. © Springer-Verlag Berlin Heidelberg 2010. 2015-06-16T08:19:39Z 2015-06-16T08:19:39Z 2010-01-01 Conference Paper 18675662 2-s2.0-84903840618 http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84903840618&origin=inward http://cmuir.cmu.ac.th/handle/6653943832/39245 Springer Verlag |
institution |
Chiang Mai University |
building |
Chiang Mai University Library |
country |
Thailand |
collection |
CMU Intellectual Repository |
topic |
Control and Systems Engineering Computer Science (all) |
spellingShingle |
Control and Systems Engineering Computer Science (all) Wudhikarn R. Smithikul C. Manopiniwes W. Developing overall equipment cost loss indicator |
description |
This research has an objective to create the new indicator for evaluating the performance and efficiency of the machine. This indicator is built as purpose to solve the problems that occurred in Overall Equipment Effectiveness (OEE) indicator. OEE is the main indicator of TPM, which focuses on machine maintenance. This indicator emphasizes how to find loss in the machine with no consideration of production cost. As considering the priority between the machine without regarding the machine capacity, production cost and value of the products, it could cause the improper priority to the machine. Therefore, the researcher has built a new indicator and also implemented with fibre cement manufacturing company. In the case study that the machine had been implemented, the result represented that the machine which had the highest OEE at 76.7%, was not the machine that had the lowest production cost loss value. The machine's overall production loss value costs 25.01 million baht. The machine that has even the least production loss value costs 2.28 million baht has the OEE only 71.7%. This OEE is the lowest in all of machines. The data represents that the OEE cannot sequence the problems appropriately because of the differences of the machines, including production capacity, production cost and the value of the products. These all differences will directly affect to the production loss value of each machine. Consequently, the new indicator in this research has been built to solve these OEE problems. This indicator can sequence the problems of each machine by calculating the production loss and represents the results as the monetary unit. © Springer-Verlag Berlin Heidelberg 2010. |
format |
Conference or Workshop Item |
author |
Wudhikarn R. Smithikul C. Manopiniwes W. |
author_facet |
Wudhikarn R. Smithikul C. Manopiniwes W. |
author_sort |
Wudhikarn R. |
title |
Developing overall equipment cost loss indicator |
title_short |
Developing overall equipment cost loss indicator |
title_full |
Developing overall equipment cost loss indicator |
title_fullStr |
Developing overall equipment cost loss indicator |
title_full_unstemmed |
Developing overall equipment cost loss indicator |
title_sort |
developing overall equipment cost loss indicator |
publisher |
Springer Verlag |
publishDate |
2015 |
url |
http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84903840618&origin=inward http://cmuir.cmu.ac.th/handle/6653943832/39245 |
_version_ |
1681421619692568576 |