Developing overall equipment cost loss indicator
This research has an objective to create the new indicator for evaluating the performance and efficiency of the machine. This indicator is built as purpose to solve the problems that occurred in Overall Equipment Effectiveness (OEE) indicator. OEE is the main indicator of TPM, which focuses on machi...
Saved in:
Main Authors: | Wudhikarn R., Smithikul C., Manopiniwes W. |
---|---|
Format: | Conference or Workshop Item |
Published: |
Springer Verlag
2015
|
Subjects: | |
Online Access: | http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84903840618&origin=inward http://cmuir.cmu.ac.th/handle/6653943832/39245 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Similar Items
-
Improving overall equipment cost loss adding cost of quality
by: R. Wudhikarn
Published: (2018) -
Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
by: Ratapol Wudhikarn
Published: (2018) -
Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
by: Wudhikarn R.
Published: (2017) -
Improving overall equipment cost loss adding cost of quality
by: Wudhikarn R.
Published: (2014) -
Overall weighting equipment effectiveness
by: R. Wudhikarn
Published: (2018)