Safety analysis for grounding potential rise of two neighbouring substations: Case study of metropolitan electricity Authority's system

This paper presents construction procedures for small air insulated substation (temporary substation) in the existing substation compound to be operated during renovation of the existing air insulated substation (AIS) to be gas insulated substation (GIS). During the time of isolating ground grid of...

Full description

Saved in:
Bibliographic Details
Main Authors: Phayomhom A., Chirataweewoot N., Intharaha S., Sirisumrannukul S., Kasirawat T., Puttarach A.
Format: Conference Proceeding
Published: 2017
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84872106416&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/42703
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University

Similar Items