Safety analysis for grounding potential rise of two neighbouring substations: Case study of metropolitan electricity Authority's system

This paper presents construction procedures for small air insulated substation (temporary substation) in the existing substation compound to be operated during renovation of the existing air insulated substation (AIS) to be gas insulated substation (GIS). During the time of isolating ground grid of...

Full description

Saved in:
Bibliographic Details
Main Authors: A. Phayomhom, N. Chirataweewoot, S. Intharaha, S. Sirisumrannukul, T. Kasirawat, A. Puttarach
Format: Conference Proceeding
Published: 2018
Subjects:
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84872106416&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/51579
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University