Safety analysis for grounding potential rise of two neighbouring substations: Case study of metropolitan electricity Authority's system
This paper presents construction procedures for small air insulated substation (temporary substation) in the existing substation compound to be operated during renovation of the existing air insulated substation (AIS) to be gas insulated substation (GIS). During the time of isolating ground grid of...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Conference Proceeding |
Published: |
2018
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84872106416&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/51579 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Be the first to leave a comment!