Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation

In this contribution, the investigation on the failures of 115-kV capacitor banks during switching in Chiang Mai 3 substation is presented. The switching transient is caused by energizing an isolated bank and back-to-back switching. Close time of circuit breaker for energizing capacitor bank, system...

Full description

Saved in:
Bibliographic Details
Main Authors: Kanitpanyacharoen S., Premrudeepreechacharn S.
Format: Conference Proceeding
Published: 2017
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=80053653451&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/42980
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University